30
Jun 2020
First 7-Cell unit underway.
I have to connect the electricity to the reactor core, finish the plumbing, and connect the electronics to the water level sensor and solenoid switches.
It is starting to resemble the electrolyzer we drafted up in our plans.
I’m feeling good about the progress.